Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the onecom-ilotheme domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentynineteen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentyseventeen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentysixteen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentytwentyfive domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentytwentyfour domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentytwentythree domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /customers/2/4/9/cxu5ql5zr/webroots/www/wp-includes/functions.php on line 6260 The build – Chione
Blog Image

Chione

The daughter of the north wind

This is the story of the Norwegian yacht SY Chione. Starting as an Oyster 575 in 2013 growing to an Oyster 675 in 2019

Pictures from the takeover

The build Posted on Sat, August 09, 2014 10:25:09


Takeover day two and three

The build Posted on Sat, August 09, 2014 02:36:56

I’m lying in my bed and the rain is hammering the deck. Gale warnings are out for the whole area. But, no worry. We are still securely moored at Foxes Marina in Ipswich after three very, very intensive days. Day two we went sailing in beautiful conditions. Warm, sunny and 10-14 knots of wind on flat sea. John, Adrian and James from Oyster and Magnus and I. Wonderful sailing and she moves like a princess. We tried all type of sailing with all kind of sail settings. Genoa and main, cutter rig, cruising chute and gooswing. Everything performed perfect – topped 9 knots in 12-14knots of wind with absolutely no hard efforts.

Day three we have spent in the boat going through IT and communicatin and packing away all the spares and other stuff. It fills the cockpit but is just, nearly unnoticed swallowed into the corners of the boat. She has such a tremendous amount of storage space. Later Magnus and I cooked our first meal in the boat and watched a movie from the nas drive;)

We are so happy with everything and Oyster is really taking good care of us. All formalities are now in place and we just have to wait for the remains of the hurricane Bertha to pass. Karl will arrive on Sunday and with Karl aboard and Bertha away we are off for Helgoland late Sunday/early Monday.

The forecast is 15-25 knots SW, but unsettled. Perfect , but wet:)



Takeover day one

The build Posted on Wed, August 06, 2014 20:49:51

Has anyone been the proud owner of a brand new car with all the new, most fantastical technical stuff? Imagine, when picking it up you have to spend 10 hours to get explained the engine, the steering, the servo, the brakes +++++ and then try out ever single function. By then it’s evening and you are sent home to sleep before you actually are allowed to drive the car the following morning. Can’t imagine? Me neither.

However, that’s exactly what I have done today. Going through the boat, bow to stern. Lifted every floorboard, removed every panel and got explained every single component. And it took the full 10 hours, without even starting the engine! Interesting of course. Useful of course. But, hey – we want to sail!

Tommorow at 0830!



D- Day!

The build Posted on Wed, August 06, 2014 07:54:22

Magnus and I well installed in Ipswich. Take over procedure starts at 0900



Chione is sailing

The build Posted on Wed, July 23, 2014 17:21:28

Received the following pics from Oyster today. She is sailing with the entire wardrobe up!
With a 140% overlap the genoa is really the main engine on this boat. It also has a different wear and tear charcteristcs from the roll in main and I decided to go for a different cloth. The main is DYS Spectra and the genoa 4d vectran. It seems to be the perfect blade I wished for (I guess the guy at the mast is about to tension the halyard an inch:)) The problem with roll in main sails is often to get them flat when the wind is up. Hence I have asked for a flat profile on the main and the cutter sail. And, from the picture it seems as exactly what i get. The assymmetric is difficult to evaluate from the pictures, but i have asked for a quite deep sail that works well deep downwind on a pole.

Wow- Only two weeks to go?



Dinghy off

The build Posted on Wed, July 23, 2014 17:14:54

The dinghy proved to be very heavy and due to construction very difficult to get the weight evenly distributed on the two davits. This left nearly the entire 290kg on one davit. That’s no good! By advice from Oyster we have decided to exchange it with a lighter version of the same brand. But still 40hp and water skiing capacity?



Dinghy on

The build Posted on Wed, July 23, 2014 11:07:07

Handover is closing in and is today just two weeks away. Received the following message today:

RIB is on the davits but is very heavy, right on the limit of the davits. You will need to be careful when lifting the RIB. Otherwise all OK.

But, its a great dinghy for transportation, excursions and waterskiing. I hope the davits holdsmiley



Launched

The build Posted on Fri, July 11, 2014 12:23:21

Wednesday July 9 at 1130am Chione was launched. In a very professional and well trained process the mast was rigged ashore, the boat was launched and everything checked before the engine was started and the boat went to the commissioning pier. Here she will be staying for four weeks for rigging, testing and adjustments.
With empty tanks, no sails and my garage still full of equipment, she floats so high that the thruster sucks some air. However, no list and with everything in she will float like a princess. The commissioning team was instantly busy with planning of everything from testing to downloading the needed electronic charts. The last discussion on the custom backrest cushions in the cockpit was carried out and different fillings tested on site. Also the placing of the foldable hooks in cabins and bathrooms was agreed. Every single detail discussed, decided and planned. Nothing left to coincidence.
She is a truly stunning yacht and in four weeks she is under way to Sweden???



Under way

The build Posted on Tue, July 08, 2014 19:32:20

This morning the boat left Wroxham on its journey towards the ocean. Exiting! 25×5 meter and 40 ton of truck and yacht went on the road to the ocean. The length of the truck made it impossible to make the turn from the yard entrance to the road in a normal manner. So the truck had to back the 200 metres from the yard onto the road. Impressive manoeuvring and absolutely some tricks to pick up for narrow marinas:)! But from there they went forward all the way to Ipswich. However, not straight as they had a lot of detours to avoid bridges and cables less than the 6 meter+ height required. Actually one bridge is so close that a the top of the pedestal has to be de-mounted to save the needed 10cm!! Except for some leafs in the cockpit it all went very well and the boat was safely brought to Ipswich within the day. Launch has to wait for the high tide tomorrow morning.



Nearly there!

The build Posted on Sat, May 31, 2014 23:26:56

Friday May 30 was spent on the sixth and presumably last visit to the yard in Wroxham. This time we had no major outstanding decisions so it was mostly to inspect the finishes and the more than 300 custom details specified for this build. And of course to see and touch our new born baby:)

The boat is just three-four weeks from finished. The least popular guy on the yard is now spending his time to spot faults and weak spots, marking and making notes of every finding and seeing it dealt with. He’s our hero and hopefully securing the delivery of a superbly finished product. With thousands of man hours this is a handcraft from A to Z. With the attention to details and superb craftsmanship that Oyster put into their production, it’s always some tiny detail to improve. When the finish is found to be perfect and all installations pre-tested and found to work, the boat is leaving for a 3-5 hour transportation by truck to the ocean and the launch. Tentative date is set to July 8. The boat is then rigged and goes into an extensive, 4 week test program including sea trials. When every single system is extensively tested and approved the boat is handed over on August 12. The handover procedure takes two to three days and by August 16 we are hopefully off for the Maiden voyage:)

Next visit will be for the launch!!



Taking shape

The build Posted on Thu, May 22, 2014 18:56:14

The mould of the hull started in September 2013 and the outfit started in November. During the winter the boat started to take shape.